Blue Spruce Habitat for Humanity

Scope of Work: Mold Remediation. EDI takes great pride in being able to make a contribution to the community and to a great organization like Blue Spruce Habitat for Humanity. EDI employees were happy to volunteer their expertise, time and materials to such a worthy cause as Habitat for Humanity. The local chapter of Habitat … Read More

Aspen

Scope of Work:  Mold Remediation. EDI installed equipment to remove standing water from the crawl space areas, reattached batt insulation and secured with suitable fastening systems. Many of the units contained high amounts of construction debris including large boulders over 100 lbs. EDI cleaned mold-like material from floor joists using IAQ 2500. EDI sprayed exposed … Read More

Steamboat Springs

Scope of Work:  Asbestos and Regulated Building Materials. EDI was contracted to complete the removal and disposal of asbestos-containing building materials and regulated building materials. EDI performed the removal of these materials in 7 different facilities located at the base of the Steamboat Springs Ski Resort. Work areas consisted of multiple shops, restaurants, and condos … Read More

St. Anthony’s

Scope of Work: Hazardous Material Remediation. EDI successfully excavated, abated and disposed of just under 17,000 cubic yards of lead and asbestos contaminated soils. Additionally, EDI excavated and removed approximately 7,000 lineal feet of contaminated transite pipe for disposal. All contaminated soils and pipe were properly manifested per State and Federal regulations for disposal. EDI … Read More

Valmont Power Plant

Scope of Work: Site Development, Asbestos Abatement. EDI removed contaminated fly ash, asbestos insulation and re-insulated Unit #5 boiler walls, penthouse & attic plenum. This unique project faced many tough challenges. The containment was constructed 165 feet in the air, utilizing a temporary elevator, on scaffolding and narrow catwalks. The Valmont Power Generating Facility was … Read More

Currigan Hall

Scope of Work: Asbestos Abatement, Demolition. EDI performed the asbestos abatement of the walkway/bridge which connected Currigan Hall with the Denver Performing Arts Center. The scope of work included removal of 24,000 square feet of spray-on fireproofing. EDI created a complete waterproof containment system and removed all of the asbestos containing material above a busy … Read More

Wal-Mart

Scope of Work: Asbestos Abatement, Regulated Building Materials. Construction of a 226,000 square foot Wal-Mart Store in Lakewood, Colorado required removal of asbestos and regulated building materials from 27 structures prior to demolition. EDI’s crew removed asbestos flooring, acoustical spray-on fire-proofing, pipe insulation brick and block coating and contaminated soils. EDI completed all 22 buildings … Read More

Villa Italia Mall

Scope of Work: Asbestos Abatement, Universal Waste. EDI performed the asbestos abatement and removal of the regulated building materials from the entire Villa Italia Mall, including four surrounding buildings. The asbestos abatement work for this project included removal and disposal of 14,000 square feet of cinder block coating, 14,000 square feet of transite, all of … Read More

McKee Medical Center

Scope of Work: Mold Remediation. Environmental Demolition, Inc. was contracted to remove all contaminated construction debris, cleanup all mold, encapsulate wooden surfaces, install the vapor barrier, and upgrade the ventilation in nine crawlspaces beneath the hospital building. “Thanks for your great customer service, everyone has been great to work with.” — Brian Kane, Manager Plant … Read More

Buckley Air Force Base

Scope of Work: Interior/Structural Demolition. EDI was contracted to remove asbestos-containing materials from the former Air Traffic Control Tower including floor tile and mastic, transite panels, and window caulking, as well as demolition of the former control tower after removal of ACM was completed. EDI completed this project safely and on time. General Contractor: PCL … Read More