Cherokee Units 1 & 2 Decommissioning-Clean Air Clean Jobs

Boiler Units 1 & 2 were scheduled for decommissioning in April 2012 to be in accordance with the Federal Clean Air & Water Act. Prior to deconstruction, EDI was contracted to remove all Class 1 and Class 2 Asbestos containing materials.  Approximately 88,000 square feet of boiler steel plate lagging and associated duct had to … Read More

Byron G. Rogers Courthouse and Federal Office Buildings

E.D.I. was a third tier sub-contractor on this fast-track project which presented many challenges which were resolved with creative project management, full-containment designs and innovative negative air engineering controls. Not to mention, all employees on the job site went through and passed an extremely stringent Federal background check investigation. The scope of work included complete … Read More

Marathon Oil

Scope of Work: Asbestos and Lead Abatement, Mecury Cleanup. EDI removed asbestos, lead and mercury contamination from various buildings and site areas in preparation for site demolition. Enclosed, wet and excavated asbestos – containing soils from approximately a 20,000 square foot area. Owner and Location: Marathon Oil Company 7400 S. Broadway Littleton, CO 80122 Rick … Read More

Bauer Building

Scope of Work: Interior Demolition. EDI crews performed complete interior demolition of 24,000 square feet on the second and third floors of the building.  Load-out of all debris was performed at night to minimize disruption to an operating restaurant and bar on the first level.  Asbestos abatement in the building stairwells was also part of … Read More

Colorado State Capitol

Scope of Work: Demolition, Asbestos Abatement, Universal Waste. Office of Energy Conservation Building: EDI removed all TSI piping, dismantled the existing boiler and removed all asbestos containing material. In Addition, EDI removed and disposed of 2,000 square feet of spray on acoustical material within a full containment. The windows were removed along with asbestos containing … Read More

Union Station

Scope of Work:  Lead Abatement. At Union Station the lead-based paint on 200 steel beams, above the pedestrian walkway, was in very poor condition with significant peeling and flaking. Sandblasting the beams was not an option because of the potential for lead contamination. EDI used an alternative abatement method which utilized a high-pressure wash with … Read More

Denver Dry Building

Scope of Work:  Lead Abatement. EDI  removed and disposed of the lead-based paint on the street level exterior steel window framing along the 16th Street Mall and California Street in Downtown Denver. The abatement of the lead-based paint included all paint from the street level to the masonry and brickwork above the window framing and … Read More

University East Pavilion Hospital

Scope of Work: Asbestos Abatement, Building Demolition, Universal Waste. This project required complete abatement of asbestos, lead, regulated building materials and the demolition of the entire structure. The asbestos abatement work at the former East Pavilion Hospital consisted mostly of TSI pipe and fittings. 7,000 linear feet of pipe was removed along with 3,100 fittings. … Read More

Shea Homes

Scope of Work: Mold Remediation. EDI has performed the mold remediation in the crawl spaces of over 1,100 homes. The typical process involves; clean-up of construct ion debris, removal or regrading of soils, cleaning mold with a fungicide, removal and replacement of damaged building materials, encapsulate wood surfaces using an anti-microbial paint and installation of … Read More

McKee Medical Center

Scope of Work: Mold Remediation. EDI was contracted to remove all contaminated construct ion debris, cleanup all mold, encapsulate wooden surfaces, install the vapor barrier, and upgrade the ventilation in nine crawlspaces beneath the hospital building. “Thanks for your great customer service at McKee, you have been great to work with on this remediation project. … Read More