Buckley Air Force Base

Scope of Work: Interior/Structural Demolition.

EDI was contracted to remove asbestos-containing materials from the former Air Traffic Control Tower including floor tile and mastic, transite panels, and window caulking, as well as demolition of the former control tower after removal of ACM was completed. EDI completed this project safely and on time.

General Contractor:

PCL Construction Services
2000 S. Colorado Blvd. Tower 2, Suite 2-500
Denver, CO 80222

Consultant:

IHI Environmental
3000 Youngfield St. #285
Lakewood, CO 80215